Development
DEVELOPMENT
STRATEGY
Our development strategy is essentially based on the application of specifications contained in the concession contract namely: using the 1.2perimeter, equipment maintenance, personnel recruitment and our services installation, in the short term.
In mid-term, the relocation to perimeter 2 of 675 meters of dyke and 715 meters of dock, with the purchase of perimeter 1.2 equipment and construction of the buildings.
In the long term, become a reference in the sub-region in terms of quality of service, cost policy with the possibility of carrying out off-shore operations.
INVESTMENT
PROGRAM
Phase 2 activities entailing: the extension of the terminal, the construction of three-level administrative buildings, a maintenance workshop, and a potting and de-stuffing storage will be provided for. The company also intends to increase its equipment.
Innovations
A Kribi Conteneurs Terminal et chez les autres partenaires portuaires, l’heure est à la mise en place effective de la dématérialisation des procédures et d’une plateforme interactive où interviennent les différents acteurs de la chaine portuaire.
Check out our
Frequently Asked Questions
Find the answer to some of your questions about our activities or organization.